检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中广核工程有限公司,广东深圳518000 [2]中冶建筑研究总院有限公司,北京100088
出 处:《工业建筑》2010年第1期17-20,共4页Industrial Construction
摘 要:高温高湿环境给核电站核岛筏基混凝土整浇和养护带来诸多困难,尤其是易导致混凝土中心温度过高,内外温差过大,不利于裂缝控制。以某核电站核岛筏基在高温高湿环境下的混凝土浇筑的温度应变监控数据为基础,结合三维有限元数值仿真模型的理论分析结果,对养护期间的混凝土裂缝控制进行深入分析。经有效温度应变监控养护的该筏基混凝土拆模后未出现明显裂缝。此方法为其他核电站筏基混凝土浇筑裂缝控制提供了重要参考依据。Hot and humid environment brings difficulties to pouring concrete and curing of raft foundation for nuclear islands of nuclear power plants, it especially causes the high central temperature of the concrete and a great difference between internal and external temperature, which are harmful for controlling cracks. Based on the monitoring data of temperature strain in the process of pouring concrete of raft foundation for nuclear islands in hot and humid environment, a 3-D finite element numerical simulation model is set up and theoretical analysis results are given, controlling cracks on the concrete during the curing period is analyzed. There are no obvious cracks on the concrete after stripping. Which provides an important basis for crack control of pouring concrete of raft foundations for other nuclear power plants.
分 类 号:TU755[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222