高阶段采场充填体强度及稳定性研究  被引量:40

Research on the Strength and Stability on Fill Body of High-bench Stope

在线阅读下载全文

作  者:曾照凯[1] 张义平[1] 王永明[1] 

机构地区:[1]贵州大学

出  处:《金属矿山》2010年第1期31-34,共4页Metal Mine

基  金:贵州省教育厅科学研究重点项目(编号:黔教科2006203);贵州省级研究生创新基金项目(编号:省研理工2007009)

摘  要:从胶结充填体在采空区所起的力学作用入手,借助于经验类比法和数学力学模型计算法,得出了能够满足井下采空区所需的胶结充填体强度的要求,为矿山充填配比设计提供了强度依据。同时也分析了暴露宽度与暴露高度对胶结充填体强度的影响关系,揭示具有稳定性的胶结充填体力学强度变化特性。结合安徽某铜矿的工业性试验情况进行了实例分析,从而验证了上述结论的合理性。Based on the mechanical analysis of the cemented fill body in the mined-out are,and by the analogy of experience and mechanical model of mathematical calculation,the strength requirement of cemented fill body for the underground mined-out area were put forward,providing the strength warranty for mix proportion design of mine fill body.Meanwhile,the effect of explored wide and height on strength of cemented fill body was analyzed,and the variety characteristics of mechanics strength of stability cemented fill body were revealed.This conclusion above has been proved to be reasonable in combination with the industrial experiment result in a copper mine in Anhui Province.

关 键 词:胶结充填体 强度设计 自立高度 稳定性 高阶段采场 

分 类 号:TD853.343[矿业工程—金属矿开采] TD862.1[矿业工程—矿山开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象