天津开发区第一污水厂升级改造工艺的选择与分析  被引量:12

Selection and Analysis of Upgrading and Reconstruction Process of First WWTP in TEDA

在线阅读下载全文

作  者:夏文辉[1] 

机构地区:[1]天津市市政工程设计研究院,天津300051

出  处:《中国给水排水》2010年第4期15-18,共4页China Water & Wastewater

摘  要:随着国家和地方对城镇污水处理厂污染物排放标准的逐年提高,已经建成的很多污水处理厂均面临升级改造,如何确定改造工艺是众多设计人员面临的严峻问题。以天津开发区第一污水处理厂升级改造工程为例,在处理规模不能减量及用地受限等约束条件下,分析探讨了污水处理厂升级改造工艺的选择要点。指出,对污水处理厂的升级改造需充分挖掘现有工艺的潜力,结合工程投资、运行成本、工程周期、处理效果等,根据具体情况确定改造工艺。As the national and local discharge standards of pollutants for municipal wastewater treatment plants are stricter year by year, a lot of built wastewater treatment plants are facing the necessity of upgrading and reconstruction. How to determine the reconstruction process is a serious problem for design engineers. Taking the reconstruction project of First WWTP in Tianjin Economic-technological Development Area (TEDA) as an example, the main considerations in selection of upgrading and reconstruction process of WWTP are discussed under' the conditions of constant treatment capacity and limited land occupation. The potential of existing processes should be fully exploited during upgrading and recon- struction process of WWTP. Combined with project investment, operation cost, project cycle and treatment efficiency, the reconstruction process should be determined according to the concrete situation.

关 键 词:升级改造 DAT—IAT 后置反硝化滤池 

分 类 号:X703[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象