检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]State Key Laboratory of Ocean Engineering,Shanghai Jiaotong University
出 处:《Journal of Shanghai Jiaotong university(Science)》2010年第1期103-107,共5页上海交通大学学报(英文版)
基 金:the Science and Technology Committee of Shanghai (No. 07DZ22027)
摘 要:Mooring,towing and installing tests on immersed tunnel caissons across the Yong River are carried out in basin to investigate the motions and line tensions.In the towing operation,the maximum tension exists in the case that half caisson is exposed to waves and currents.The cooperation of operating manually on many lines at the same time is very difficult and important.The dynamic behavior of the caisson and the line tensions are affected more by the manual operations than by waves and currents.In the installing operation,the tensions of hoisting lines are much larger than the positioning lines.Mooring, towing and installing tests on immersed tunnel caissons across the Yong River are carried out in basin to investigate the motions and line tensions. In the towing operation, the maximum tension exists in the case that half caisson is exposed to waves and currents. The cooperation of operating manually on many lines at the same time is very difficult and important. The dynamic behavior of the caisson and the line tensions are affected more by the manual operations than by waves and currents. In the installing operation, the tensions of hoisting lines are much larger than the positioning lines.
关 键 词:immersed tunnel CAISSON INSTALLATION model test
分 类 号:U459.5[建筑科学—桥梁与隧道工程] U655.544.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40