摘 要:占化水电站为低水头水电站,与上一梯级宣光水电站相距仅约24 km,可供作为坝址的场地相对有限,在所拟选的几个坝址中,地形、地质、主体工程枢纽布置、施工总布置场地等条件区别不大,最优的2个比选坝址的工程总投资相差不到百分之一,一期施工导流的土石子围堰成为坝址比选关键的决定因素之一。文章简单介绍坝址比选的情况。Chiem Hoa Hydropower Station with a low water head is only about 24kin away from the upper cascade Tuyen Quang Hydropower Station. There is limited place to build dam for the station. Proposed dam sites have similar topographic and geologic conditions for main works arrangement and construction general layout. The difference of total investment between the best two options is less than 1%. The earth-rock filled cofferdam of the 1st phase construction diversion plays a key role to determine the dam site. The article presents the process of comparison and selection of dam site for the station.
分 类 号:TV551.6[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117