冬季低温期碾压沥青混凝土心墙施工技术  被引量:8

Construction Technology for Roller Compacted Asphalt Concrete Core during Low Temperature Period in Winter

在线阅读下载全文

作  者:谢晓龙 

机构地区:[1]中国葛洲坝集团股份有限公司第二工程公司,四川成都610091

出  处:《四川水力发电》2010年第1期105-108,共4页Sichuan Hydropower

摘  要:寒冷地区冬季由于气温低,采用常规施工技术不能进行土石坝的碾压沥青混凝土心墙施工,工程要停工5~6个月,从而延长了工程施工工期。应用冬季低温期碾压沥青混凝土心墙施工技术,能够保证在冬季低温期进行施工,提高了工程施工进度,降低了工程施工成本,进而缩短了工程建设时间。In cold area,conventional construction technology is not suitable for roller compacted asphalt concrete core of earth and rockfill dam due to low ambient temperature.In these circumstances,construction must be stopped for 5 to 6 months and construction time delayed.Construction technology for roller compacted asphalt concrete core used during low temperature period in winter enables construction to be carried out in cold winter,then accelerates construction progress,reduces construction cost and shorten construction period.

关 键 词:寒冷地区 土石坝碾压沥青混凝土心墙 低温期施工技术 

分 类 号:TV544.924[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象