积石峡水电站导流洞与中孔泄洪洞交叉段顶拱混凝土施工技术  

Construction of the Crown Concrete of the Intersection Section of Diversion Tunnel and Middle Flood Discharging Tunnel in the Jishi Gorge Hydropower Station

在线阅读下载全文

作  者:郭维茹 施有勇 

机构地区:[1]中国水利水电第四工程局有限公司,青海西宁810006

出  处:《青海电力》2009年第A01期30-33,共4页Qinghai Electric Power

摘  要:积石峡水电站导流洞与中孔泄洪洞交叉段顶拱跨度大,断面为平顶扭面,支撑系统繁杂,顶拱混凝土浇筑模板支撑系统采用底部钢管支柱支撑桁架梁平台,平台上搭设碗扣脚手架支撑方法。此种施工方法的应用减少了对导流洞施工的干扰,加快了施工进度,保证了交叉段顶拱混凝土质量,确保了关键工期。In the Jishi Gorge Hydropower station, the crown of the the intersection section of the diversion tunnel and flood discharging tunnel is of a large span and complicated support. The support of the moulding board for crown con- crete pouting use steel pipe post at bottom to support trusswork platform eupleck joint scaffold is build up. This con- struction technique reduces disturb to the diversion tunnel construction, speeds up the construction progress, ensure the good concrete quality and the key schedule of the project.

关 键 词:交叉段 顶拱 混凝土 支撑系统 

分 类 号:TV52[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象