检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]内蒙古电力勘测设计院,内蒙古呼和浩特010020
出 处:《可再生能源》2010年第1期105-108,共4页Renewable Energy Resources
摘 要:在对风电场进行风资源评估时,常采用气象站与测风塔的相关关系,将现场测风数据订正为一套反映风电场长期平均水平的代表性数据进行风资源分析,而对代表年风速订正是否合理是影响风资源评估误差的重要因素。文章以内蒙古地区某风电场风资源分析为例,探讨采用常规方法和改进方法对代表年风速的订正所产生的误差情况,结果表明,通过改进方法进行修正得到的代表年平均风速的变化规律与气象站多年的变化规律一致,此方法弥补了常规方法中的一些不确定因素对代表年修正结果的影响,减小了误差范围。When carrying out the wind resource assessment,a set of revised representative wind data, which is based on the relationship between the local wind mast and nearby weather station, is always used to carry out the analysis on the wind source, and the determination of the representative wind speed is the key faetor which influenees the error of the assessment. In this paper, an error analysis has been taken between the conventional method and the improved method through assessing the wind resource of a wind farm in Inner Mongolia. It is found that the revised wind resouree in the representative year is consistent with that of the nearby weather station. Moreover, the imnrowd method has the advantage of less uncertainty and less error.
分 类 号:TK89[动力工程及工程热物理—流体机械及工程] P412.16[天文地球—大气科学及气象学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145