编组站模拟系统中到达流生成的方法  被引量:5

Method of Creating the Received Wagon Flow for the Computer Simulation in Marshalling Station

在线阅读下载全文

作  者:谭立刚[1] 杨肇夏[1] 

机构地区:[1]北方交通大学交通运输学院

出  处:《北方交通大学学报》1998年第6期43-47,共5页Journal of Northern Jiaotong University

摘  要:编组站到达流的生成是铁路编组站技术作业系统模拟的基础工作之一,本文提出一种以列车运行图为依据,生成到达列车流的新方法.此外,编组站到达流应该包含到达列车流和本站批准装车流两个方面,文中亦为本站批准装车流提供了生成方法.The creating of the wagon flow coming to marshalling station is one of basic works for the computer simulation system of technological processes in railway marshalling station. This paper presents a new method for creating the wagon flow of received train referring to the train diagram. Furthermore, the wagon flow coming to the marshalling station should include two aspects: one is the wagon flow of received train, the other is the local wagon flow. This paper presents the method for creating the local wagon flow also.

关 键 词:编组站 列车运行图 模拟系统 到达车流 生成方法 

分 类 号:U292.16[交通运输工程—交通运输规划与管理] U292.41[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象