检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:白铁勇[1] 余代俊[1] 朱学强[1] 李春华[2]
机构地区:[1]成都理工大学地球科学学院,四川成都610059 [2]成都市勘察测绘研究院,四川成都610081
出 处:《测绘》2010年第1期39-41,48,共4页Surveying and Mapping
摘 要:本文通过对松潘县某水电施工控制网在5.12汶川大地震震前震后的观测数据进行处理,发现GPS点位发生了较大的变化。结合该地区的实际地质情况分析,地震对该地区产生了一定的影响。水电施工过程中应以第二次复测提供的控制点数据为准,从而为水电施工提供了准确可靠的控制成果。This article analyzed the observation data of some hydropower's construction control network in Song Pan County. By comparing the observation data before and after 5-i2 Wenchuan heavy earthquake, we found that great changes of GPS sites had taken place. We synthetically analyzed the geological condition of the region and get a conclusion: the heavy earthquake had a certain impact in this region. Therefore the hydropower's construction process should be based on the second retest data so as to provide an accurate and reliable control result for the hydropower's construction.
分 类 号:P258[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3