检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈巧珍[1] 阳方[1] 彭琦[1] 仇东丽[1] 孟征兵
机构地区:[1]武汉科技大学钢铁冶金及资源利用省部共建教育部重点实验室,湖北武汉430081 [2]涟源钢铁股份有限公司,湖南娄底417000
出 处:《武汉科技大学学报》2010年第1期1-5,共5页Journal of Wuhan University of Science and Technology
摘 要:以某钢厂230t钢包为研究对象。通过实验水模型对现场生产过程的模拟,研究底吹透气元件的布置方式和吹氩流量对搅拌效果和夹杂物去除率的影响。结果表明.双透气元件吹氩优于单透气元件吹氩搅拌效果,0.6R-γ双透气元件布置方式最佳,混匀时间随吹气量和透气元件夹角的增大而减少;夹杂物的去除率取决于吹氩量和吹氩时间,在0.2~0.8L/min吹气量下,处理时间为0~4min时夹杂物去除效果最好,5~8min时可去除大部分夹杂物,24min左右可去除所有夹杂物。Study of a 230 t ladle in a certain steel plant is carried out by water model in the lab to work out how the number and layout of ventilation devices and flow rate of bottom blowing argon influence the stirring effect and inclusion removal. The results show that during the stirring for mixing, bottom blowing argon with 0.6R-γ scheme is the most ideal choice after considering all the factors, and the mixing time decreases as the flow rate of argon and angle of ventilation devices increases. What's more, during the inclusion removing process, the best effect can be obtained in the first 4 minutes under a little flow rate. And at about 8 minutes, most of the inclusions can be removed. Almost all the inclusions can be removed within about 24 minutes in the lab.
分 类 号:TF769.2[冶金工程—钢铁冶金] TQ325.405[化学工程—合成树脂塑料工业]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249