中国血吸虫病防治的项目管理模式及其演变  被引量:31

Project management model and its evolution in schistosomiasis control programme of China

在线阅读下载全文

作  者:周晓农[1] 贾铁武[1] 郭家钢[1] 王立英[2] 姜庆五[3] 

机构地区:[1]中国疾病预防控制中心寄生虫病预防控制所,上海200025 [2]卫生部疾病预防控制局 [3]复旦大学公共卫生学院

出  处:《中国血吸虫病防治杂志》2010年第1期1-4,共4页Chinese Journal of Schistosomiasis Control

基  金:国家科技重大专项(2008ZX10004-11);国家科技支撑项目(2007BAC03A02)

摘  要:本文回顾了不同阶段我国血吸虫病防治工作(血防)的项目管理模式及其演变过程,运用项目管理的基本概念分析了影响我国血防项目进展的关键因素,提出了今后我国血防项目应该遵循项目管理的原则,包括目标管理、时间管理、成本管理和质量管理等,以加速我国消灭血吸虫病的进程。The paper reviewed the project management model and its evolution in the national schistosomiasis control in China at different stages. The key factors impacting the progress of the control activities were analyzed by introducing the concept of project management, and the principles, i.e. objective management, temporal management, cost-effectiveness management, and quality management, that would have to be complied with in the future control activities were put forward, so as to accelerate the elimination of schistosomiasis in China.

关 键 词:血吸虫病 项目管理 演变 

分 类 号:R532.21[医药卫生—内科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象