深厚软土地基堆土预压法观测与分析  被引量:3

Observation and analysis of a thick soft ground by preloading method

在线阅读下载全文

作  者:何开胜[1] 袁文明[1] 陈宝勤 陈恭轼 

机构地区:[1]南京水利科学研究院土工研究所 [2]南京炼油厂设计院,南京210033

出  处:《水利水运科学研究》1998年第4期355-362,共8页

摘  要:本文论述用30m深塑料排水板处理27m厚淤泥质粘土地基的工程实践。通过对两座5万m^3油罐地基堆土18m超载预压和充水17m复压测试,结果表明:塑料排水板的有效作用深度可达30m;预压后地基承载力可达340kPa、最大沉降量达3.36m,固结度95%。测试还表明:在含有“千层饼”薄层粉砂结构的淤泥质粘土中,插排水板后排水团结较快,可以每层30cm、每天1.5~2kPa的堆土速度,不间歇地一次加荷到位。安全控制应以沉降速率为主、水平位移速率为辅,其标准可分别采用20mm/d和4mm/d。The ground of 27m thick mucky and silty clay treated with 30m deep prefabricated drain in combination with preloading was discussed in the paper. The test results of foundations of two oil tanks of 50 000m^3 which had been preloaded by 18m thick fill embankment and retested by 17m water-filling show that the effective depth of prefabricated drains can reach 30m,the bearing capacity can reach 340kPa after preloading,the maximum settlement of the ground is 3. 36m and the degree of consolidation reaches 95%.The tests also show that the pore water pressures resulted from filling are rather small in the thick soft clay with many silty sandy intercalations,so the safety monitoring of the ground should be carried out according to the rates of settlements and lateral displacements. Due to the rapid dissipation of pore pressure,the fill can be continuously proceeded to top in layers of 30cm thickness at a loading speed of 1. 5 to 2 kPa/d.

关 键 词:软土地基 堆土预压法 油罐 安全监测 

分 类 号:TU472.33[建筑科学—结构工程] TU471.8[建筑科学—土工工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象