检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张建华[1]
出 处:《水电能源科学》2010年第3期74-76,50,共4页Water Resources and Power
摘 要:以k-ε湍流模型封闭Reynods方程,采用VOF法追踪自由水面,对缅甸DAPEIN水电站表孔溢流坝的水流流动进行了三维数值模拟。结果表明,溢流坝的泄流能力、水面线、压力分布与流速分布等数值模拟结果与模型试验实测结果吻合,数值模拟结果可信,选择的紊流模型合理,求解方法可靠,可为工程设计提供全面、合理的参考。Reynolds equations is closed by the κ-ε turbulent model. Volume of fluid method is used to trace free water surface. The water flow of overflow dam of DAPEIN Hydropower Station in Myanmar is analyzed by three dimensional numerical simulation. The results show that the overflow dam discharge capacity, water surface profile, pressure distribution and velocity distribution is consistent with the measured data of model test, and the numerical simulation result is correct, At the same time, the choice of turbulent model is reasonable and the solving method is reliable. Thus, it provides reference for the engineering design.
关 键 词:溢流坝 三维数值模拟 定常流 VOF方法 k-ε湍流模型
分 类 号:TV133[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188