检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国三峡开发总公司金沙江水文气象中心,四川成都610042 [2]长江水利委员会长江上游水文水资源勘测局,重庆400014
出 处:《人民长江》2010年第3期78-80,共3页Yangtze River
摘 要:向家坝水电站在截流施工前曾专门做过截流水工模型试验。为了验证模型试验成果并为以后类似截流工程积累宝贵资料,采用高精度的RTK GPS双星接收机、数字测深仪、绘图仪、计算机及数据链设备,对向家坝水电站在截流期龙口高速水流给下游河床造成的冲刷进行了实时监测。其成果为截流施工组织、调度决策提供了科学依据,保证了截流施工的顺利进行。Before the river closure of Xiangjiaba Hydropower Station,the hydraulic model test of river closure was carried out.In order to verify the test results and accumulate valuable data for similar closure construction,the high-precision RTK GPS Bi-satellite Receiver,digital depthometer,plotter,computer and data link equipment were adopted to perform the real-time monitoring of scour in downstream river bed caused by high-velocity flow at closure gap during the period of river closure.The results provide a scientific basis for the construction organization,dispatching and decision-making of river closure and ensure the success of river closure.
分 类 号:TV551.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.154