JIT系统下的单机提前/拖期调度问题  被引量:4

Early/Tardy Machine Scheduling Problem in JIT Systems

在线阅读下载全文

作  者:吴悦[1] 汪定伟[1] 

机构地区:[1]东北大学信息科学与工程学院

出  处:《东北大学学报(自然科学版)》1998年第6期599-601,共3页Journal of Northeastern University(Natural Science)

基  金:国家自然科学基金

摘  要:分别研究了交货期及交货期窗口下的单机调度问题,目标是寻找一个最优调度极小化提前/拖期任务数.假设如果任务在交货期或交货期窗口内完工,则不受处罚;否则,就要受到一个固定的提前/拖期惩罚.提出了在交货期及交货期窗口下的寻找最优调度的多项式算法,并以两个实例说明了算法.It was done on a single machine to deal with due date and due window problems. The objective was to find a shcedule that minimizes the number of early and tardy jobs. It was assumed that each job was not penalized if its completion timed within due window. Otherwise,it would be penalized by the fixed identical weight. Two polynomial algorithms were presented to find the optimal schedule for due date and due window and two examples were shown to illustrate the algorithms.

关 键 词:JIT系统 最优调度 交货期 排序 调度 单机调度 

分 类 号:O223[理学—运筹学与控制论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象