三河电厂锅炉侧问题分析及改造  被引量:1

Analysis and Remedial Renovation of Sanhe Power Plant's Boiler

在线阅读下载全文

作  者:赵振宁[1] 葛亚琴[1,2] 温武斌 曹红加[1] 张清峰[1] 陈鸿伟[2] 

机构地区:[1]华北电力科学研究院有限责任公司 [2]华北电力大学 [3]国华三河发电有限公司

出  处:《电站系统工程》2010年第2期24-26,共3页Power System Engineering

摘  要:三河电厂两台锅炉改烧神华煤后出现一系列问题:主汽温度低、再热器超温、排烟温度高等。通过试验研究和计算分析,找出这些问题根本原因是过热器受热面不足。据此进行了锅炉受热面增加及AA燃烧器改为水平摆动式的改造,所有问题都得到了解决。After two boilers of Sanhe Power Plant changed to bum Shenhua coal, a serial of problems appears. The temperature of the main steam is lower, the deviation of the reheat steam temperature is larger and the temperature of the flue gas is higher and so on. Through tests and calculactions, it was found that the insufficiency of heat-exchange-area (HXA) of superheater is the root cause of all these problems. Remedial measures of adding HXA and changing AA burner to horizontally tilting burner were made, all of these problems were solved.

关 键 词:主汽温度 再热温度 排烟温度 锅炉改造 

分 类 号:TK227.1[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象