检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡东升[1] 刘荣桂[1] 许飞[1] 周士金[1]
出 处:《江苏大学学报(自然科学版)》2010年第2期235-239,共5页Journal of Jiangsu University:Natural Science Edition
基 金:国家自然科学基金资助项目(50678074)
摘 要:介绍了国内首座CFRP索斜拉桥荷载试验,建立了该桥基于梁壳杆单元的有限元分析模型,进行结构有限元模拟,并与实测结果进行了对比分析.分析结果表明,基于所建模型的结构静力学分析结果与试验结果基本吻合,该模型可用于CFRP索斜拉桥结构的静力学分析.同时,荷载试验结果表明,国内首座CFRP索斜拉桥结构在役刚度和承载能力符合设计要求,整体工作性能良好.文中试验及其相关分析结果可为CFRP新型缆索材料在桥梁工程中的进一步推广应用提供参考依据.A load test of the carbon fiber reinforced plastics(CFRP) cable stayed bridge first in China was introduced.A finite element model(FEM) of this bridge,based on beam elements,shell elements and bar elements was established.A finite element analogy of this structure was carried out,and the simulated results were contrasted with test results.The analysis results show that the results of static analysis based on above FEM agree well with experiments,so it is appropriate to use this model in a static analysis of CFRP cable stayed bridge.At the same time,the results of test indicate the stiffness in-service and the carrying capacity of the CFRP cable stayed bridge first in China conform to the specifications and design requirements.The overall performance of this structure is fine.The test and related analysis results provide reference for further engineering applications of CFRP cable bridge structure.
关 键 词:CFRP 索 斜拉桥 荷载试验 有限元分析模型 静力学分析
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15