出 处:《世界桥梁》2010年第1期53-55,62,共4页World Bridges
摘 要:斜拉桥换索施工控制需要在整个施工过程中对索力、主梁标高、主梁和桥塔应力等参数进行控制,通过建模计算分析,将参数增量变化分析方法运用于皎平渡斜拉桥换索工程实践中。结果表明,换索后斜拉索实测和设计索力误差控制在3%以内;主梁标高变化最大值为4~5mm,经过换索桥面线形有所优化。参数增量变化分析法可用于混凝土斜拉桥换索工程施工控制。In the construction control of cable replacement of a cable-stayed bridge, it is required that the parameters of the cable force, main girder elevation, main girder and pylon stress should be well controlled in the whole construction process. On the basis of the modeling, calculation and analysis, the parameter increment variation analysis method was applied to the construction of the cable replacement of the Jiaopingdu Cable-Stayed Bridge. The results show that after the cables of the Bridge are repleced, the error between the measured and designed cable forces is controlled within 3%, the maximum value of the main girder elevation variation is 4-5 mm, the geometric shape of the bridge deck is optimized to some extent and it is concluded that the parameter increment variation analysis method can be applied to the construction control of cable replacement of concrete cable-stayed bridges.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38