大型核电站全厂断电事故的失效模式分析  被引量:2

FAILURE MODE ANALYSIS FOR THE STATION BLACKOUT OF LARGE-SCALE NUCLEAR POWER PLANT

在线阅读下载全文

作  者:陈海燕[1] 李小华[1] 柯国土[1] 

机构地区:[1]中国原子能科学研究院

出  处:《核科学与工程》1998年第4期304-310,共7页Nuclear Science and Engineering

摘  要:运用故障树分析方法,对核电站全厂断电事故进行分析。建造了全厂断电事故即厂用电力系统A、B两列6.6kV交流应急母线LHA和LHB同时失电故障树。利用SETS程序及法国标准90万千瓦压水堆核电站200堆年运行经验反馈的可靠性数据,对全厂断电故障树作了定性、定量分析,得到了全厂断电事故的发生概率。给出了全厂断电事故的主要失效模式及发生的概率和事件的重要度。The failure modes for station blackout of nuclear power plant were studied based on the system fault tree approach. The top event in the station blackout fault tree was defined as the simultaneous power supply failure of both engineered safeguard buses LHA and LHB. Based on the component failure rates of the standard French 900MWe pressurized water reactor, the frequency of station blackout was evaluated using SETS code, with the dominant failure modes and component importances analyzed and interpreted.

关 键 词:电力系统 全厂断电 故障树 失效模式 核电厂 

分 类 号:TM623.7[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象