出 处:《电力勘测设计》2010年第1期35-38,共4页Electric Power Survey & Design
摘 要:发电厂制氢站有火灾和爆炸危险,因此制氢站的安全直接关系到整个电厂的安全。针对制氢站对防火防爆设计的特殊要求,本文以神华宁东矸石电厂一期2×330MW机组工程制氢站为例,概述了发电厂自备制氢站照明、电缆敷设、防雷布置、接地布置、防火封堵等电气部分的设计方法,并综合工程设计标准与施工标准,对设计中的关键问题作了详细概述。Due to the possibility of occuring fire and explosion hazard,the safety of hydrogen generating station relates to the safety of entire power plant directly.In order to satisfy the special criterion for fire protection and explosion prevention design,the paper introduces the detail design of hydrogen generating station in Shenhua Ningdong Phase 1 Project-2×330MW Power Plant,and summarizes the electrical parts designing method of lighting,cable installation,lightning protection,grounding,fire stopping,etc.Based on the projects design criterion and construction criterion,this paper expounds the key problems in designing process detailedly.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145