三峡电站700MW水轮发电机组国产化实践  被引量:4

Domestic Manufacture of Three Gorges Power Station 700 MW Hydro-generating Unit

在线阅读下载全文

作  者:刘利人[1] 程永权[1] 张成平[1] 胡伟明[1] 刘洁[1] 

机构地区:[1]中国长江三峡集团公司,湖北宜昌443002

出  处:《水力发电》2009年第12期12-14,36,共4页Water Power

摘  要:在国家政策支持下,依托三峡工程,通过三峡左岸电站700 MW水轮发电机组引进消化吸收再创新,实现了右岸电站水轮发电机组国产化。国产三峡机组的顺利投产,实现了我国巨型水轮发电机组自主设计、制造、安装、运行的重大跨越。三峡发电机组的国产化,推动了大型水轮发电机组关键技术的进步,引领了水电行业的发展方向,增强了我国自主设计、制造、安装、运行和管理大型水轮发电机组的能力,增强了我国企业的核心竞争力。With a national support,the domestic manufacture of Three Gorges Right Bank Power Station units are achieved after the introduction,absorb and re-innovation on 700 MW hydro-generating units of Three Gorges Left Bank Power Station.The successful operation of units manufactured domestically shows that the design,manufacture,installation and operation of huge hydro-generating unit in China have achieved a great leap,and the technology of huge hydro-generating unit in China has been a great progress.These progresses also mark the enhancement of core competitiveness of Chinese enterprises.

关 键 词:水轮发电机组 国产化 三峡电站 

分 类 号:TM312[电气工程—电机] TV741[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象