检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《科技与管理》2010年第2期43-46,共4页Science-Technology and Management
基 金:上海市决策咨询委员会项目(2008-08)
摘 要:我国经济的高速发展带动了一系列重大工程项目的启动,近年来由重大工程项目引起的民众群体性事件呈现上升趋势。在我国高度重视民生这一时代背景下,无论是从居安思危的角度,还是立足于防患于未然,对重大工程项目的社会风险因素进行识别并做出评价都有着重要的意义。基于此以重大工程项目社会风险评价的涵义为基础,分3个层次构建了动态的、可操作性较强的重大工程项目社会风险评价指标体系,同时给出了各指标具体的涵义和度量方法。Nowadays China's rapid development leads to the start of a series of large projects,and there is an upward trend of the social risk occurring resulting from large projects. Based on the perspective of vigilant in peace time, to identify the social risk factors and to assess it have an important significance. This paper gives the definition of social risk resulting from large .project firstly,and then the indicator system is proposed which includes three hierarchies about social risk resulting from large projects. Finally each indicator is explained.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31