上海长江隧桥承台及塔座大体积混凝土施工技术  被引量:3

CONSTRUCTION TECHNOLOGY OF MASS CONCRETE FOR CUSHION CAP AND COLUMN BASE OF SHANGHAI YANGTZE RIVER TUNNEL AND BRIDGE

在线阅读下载全文

作  者:陶红林[1] 庄磊 

机构地区:[1]徐州建筑职业技术学院,江苏徐州221116 [2]江阴一建建设有限公司,江苏江阴214400

出  处:《工业建筑》2010年第3期144-148,70,共6页Industrial Construction

基  金:建设部科学技术项目计划(05-k5-12)

摘  要:上海长江隧桥承台、塔座大体积混凝土的施工,采用了料控、温控、浇筑控等施工措施。其中,温控是控制大体积混凝土开裂、保证混凝土施工质量的关键工艺;而在大体积混凝土中埋设冷却水管进行降温是降低混凝土早期水化热升温的有效措施,在施工实践中取得了较好的效果,可以为类似工程提供参考。The controls of materials,pouring and temperature are used for mass concrete construction for cushion cap and column base of Shanghai Yangtze River Tunnel and Bridge. Among them,temperature control is the critical technology to control the mass concrete cracking,and to ensure the quality of concrete construction,while burying cooling water pipe in concrete is the effective measure to lower the temperature of concrete hydration heat at early age. Better results are got during construction,which provides a reference for similar projects.

关 键 词:上海长江隧桥 承台 大体积混凝土 温控 冷却水管 

分 类 号:TU755[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象