检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北电力大学电气与电子工程学院,北京102206
出 处:《华北电力大学学报(自然科学版)》2010年第2期38-42,共5页Journal of North China Electric Power University:Natural Science Edition
摘 要:电力系统仿真的准确度直接关系到系统的安全经济运行,其中负荷模型对仿真结果有显著的影响。大型电力系统仿真软件PSS/E所具有的高度模块化的结构,以及其模型库中所提供的丰富的设备模型,特别是其自带的二次开发语言IPLAN使得它能够完成各种各样的仿真任务。基于PSS/E,用接地时变导纳的动态等值方法对系统进行混合仿真,即注入实测数据代替某部分电网,发现采用不同的负荷模型对混合仿真误差有很大的影响,最后分析了原因。Power system simulation accuracy is directly related to the security and economic of system operation. As an element of the simulation, load model affects the result greatly. Large - scale power system simulation software PSS/E (Power System Simulator for Engineering) has a highly modular structure, as well as many equipment models provided by model library, in particular, its own language of the second development IPLAN make it to complete a variety of simulation tasks. In this paper, based on PSS/E, use the dynamic equivalent method - grounded time - varing admittance to implement hybrid simulation, that is, with the injected measured data in place of part of the power grid. It' s found that different load models have a great impact on the hybrid simulation error, and finally ana- lyzed the reason.
分 类 号:TM714[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.239.206