矿井综合降温设计与实施  

Mine pit synthesis temperature decrease design and implementation

在线阅读下载全文

作  者:余海亮[1] 荆现锋[1] 朱光辉[1] 马庆国[1] 荆明星[1] 

机构地区:[1]华北科技学院,北京东燕郊101601

出  处:《华北科技学院学报》2010年第1期23-27,共5页Journal of North China Institute of Science and Technology

摘  要:随着开采深度的增加,中平能化集团天安五矿受地温灾害的影响越来越严重,给安全生产带来了诸多困难,根据该矿的实际情况,采取通风系统改造、独立疏排热水和机械制冷降温对地温灾害进行了综合治理,确保了己三采区的保产、稳产和安全生产。Along with mining depth's increase, even can melt the group Tianan five ores to be getting more and more serious the ground temperature disaster's influence ,has brought many difficulties for the safety in production, according to this ore's actual situation,adopted the ventilation system transformation, the independent sparse platoon hot water and the machinery refrigeration temperature decrease has carried on the comprehensive program of public order to the ground temperature disaster, had guaranteed the three working areas guaranteed produce, the stable production and the safety in production.

关 键 词:综合降温 岩热 水热 冷却塔 天安五矿 

分 类 号:TD727.2[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象