检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《电力建设》2010年第4期32-34,共3页Electric Power Construction
摘 要:1000kV淮南—上海输电线路工程采用了单柱组合耐张塔,单柱组合耐张塔2个单柱塔之间的跳线采用了软跳线。从施工的角度看,需要根据软跳线的设计特点制定合理的施工工艺确保施工质量。结合单柱组合耐张塔软跳线真型试验,对单柱组合耐张塔软跳线施工工艺进行探讨,为1000kV淮南—上海输电线路工程的施工提供参考。1 000 kV Huainan—Shanghai transmission line project uses single-pole strain towers,and soft jumpers are adopted between 2 single-pole towers.From a view point of construction the rational construction technology should be worked out according to the jumper design features to ensure construction quality.The paper investigates the jumper construction technology in combination with soft jumper full-scale test of the single-pole combined strain tower,which offers a reference for 1 000 kV Huainan—Shanghai transmission line project construction.
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.132.79