从内部审计角度看电力工程管理存在的缺陷及改进建议  被引量:4

Existing Defects and Improvement Suggestion of Power Project Management in Respect of Internal Audit

在线阅读下载全文

作  者:赵红卫[1] 王良浩 扎西罗布 严仕海 

机构地区:[1]华东电力试验研究院有限公司,上海200437 [2]中国电力财务有限公司,北京100054 [3]西藏电力有限公司,拉萨850000

出  处:《华东电力》2010年第3期442-445,共4页East China Electric Power

摘  要:指出西藏电网审计电网工程过程中发现的问题,包括内部约束机制不健全、招投标手续不完善、现场签证管理不规范等及其具体表现。分析问题存在的原因,并在制度管理、设计管理、招投标管理、合同管理、施工管理、竣工结算管理等方面提出改进措施。The existing defects and concrete manifestation in Tibet Power Grid project audit process were indicated in this paper such as unsound internal mechanism of constraint,inadequate bidding procedures,and non-standard on-site management of visa,etc.The reasons of these existing defects were analyzed.The improvement measures were put forward in some fields such as system management,design management,bidding management,contract management,billing management,and completion settlement management,etc.

关 键 词:电网建设 企业管理 审计 

分 类 号:F426.61[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象