机构地区:[1]广东电网公司中山供电局,广东省中山市528400 [2]武汉大学电气工程学院,湖北省武汉市430072
出 处:《电网技术》2010年第4期204-208,共5页Power System Technology
摘 要:提出一种含T接线互感线路的零序阻抗参数带电测量新方法。详细介绍了该带电测量方法的原理与数学模型,给出了带电测量时互感线路的运行方式。获取测量源与利用全球卫星定位系统(GPS)作为异地测量的同步信号是2个关键技术。文中给出了带电测量装置的构成以及数字仿真结果。最后介绍了利用新方法对广东中山电网2条110kV含T接线互感线路的零序阻抗参数进行带电测量的情况,给出了带电测量结果,并与干扰法测量值以及经验估算值进行了对比。数字仿真结果与实测结果均表明该带电测量方法是可行的,测量结果准确,完全能满足工程测量要求。A new method for live line measurement of zero-sequence parameters for transmission line containing T-connection line with mutual inductance is proposed. The principle and mathematical model of the proposed method are presented in detail, and the operation mode of transmission line with mutual inductance during live line measurement is given. There are two key techniques in the proposed method, i.e., to acquire the zero-sequence current to be measured and to use Global Positioning System (GPS) as the synchronous signal for the measurement carried out at different place simultaneously. In this paper, the composition of live line measuring device and digital simulation results are given. Finally, the live line measurement process of two 110 kV transmission line containing T-connection lines with mutual inductance, which belong to Zhongshan power network in Guangdong province, China, by the proposed method are described, the live line measurement results are given and compared with the measured results by interference method and the value from empirical estimation. Results from both simulation and on-site live line measurement show that the proposed live line measurement method is feasible, and its measurement accuracy can satisfactorily meet the requirements of engineering measurement.
关 键 词:全球定位系统 互感线路 T接线 零序阻抗 带电测量
分 类 号:TM93[电气工程—电力电子与电力传动]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249