上海世博会主题馆西展厅综合管沟系统设计的地坪施工技术  

GROUND CONSTRUCTION TECHNIQUE FOR GENERAL PIPE TRENCH SYSTEM DESIGN IN WEST EXHIBITION HALL OF SHANGHAI EXPO THEME MUSEUM

在线阅读下载全文

作  者:曹巍 

机构地区:[1]上海第二建筑有限公司,上海200080

出  处:《建筑技术》2010年第4期350-352,共3页Architecture Technology

摘  要:上海世博会主题馆西展厅地面采用管沟系统设计,即:将建筑物所需的管线统一规划、合理配置在地面以下稳固的管沟内,它是城市综合管沟的一个缩影,具有增加展厅的完整性和美观、管线维修方便、使用寿命长等优点。为防止展会期间管沟及盖板体系被破坏,确保展厅的美观,在施工中对管沟边框的施工精度和地坪平整度进行了严格的控制,确保了工程质量,达到了设计要求。The ground of west exhibition hall of Shanghai EXPO Theme design, namely pipelines are planned generally and are arranged reasonably Museum adopts pipe trench system in stable underground pipe trench, which is a miniature of urban general pipe trench. It can improve the completeness and beauty of the exhibition hall, is convenient for maintenance and has long service life. To prevent pipe trenches and cover plate system from being damaged during the EXPO period and to guarantee esthetic appearance of exhibition hall, construction precision of edges of pipe trenches and floor planeness are controlled strictly during construction to guarantee engineering quality and meet design requirements.

关 键 词:中国2010年上海世博会 综合管沟系统 地坪施工 一次性建设 大空间 高精度 

分 类 号:TU81[建筑科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象