变电站运行中的35kV老旧母线分段改造  被引量:1

Partial Reinstallation of Old 35 kV Buses During Running at Substations

在线阅读下载全文

作  者:潘宇[1] 董萧涛 艾晨光[1] 

机构地区:[1]张家口供电公司,河北张家口075000

出  处:《华北电力技术》2010年第4期37-39,54,共4页North China Electric Power

摘  要:简要介绍了阎家屯220 kV变电站35 kV母线更换改造工程的概况。重点阐述了改造过程中,如何巧妙地在35 kV母线不全部停电的情况下,成功地实施母线分段及更换母线、瓷瓶及相关附件,并将主变跨越母线的过引线进行了加高,使35 kV母线更换改造工程在尽可能高的运行可靠性及最小的电量损失下继续顺利进行,并保证了设备改造期间该站和电网的安全稳定运行。This article briefly introduced the general situation of the reinstallation of 35 kV bus at Yanjiatun 220 kV substation, mainly explained how to partially reinstall new buses, insulations and accessories without a full power cut, raising the crossover wires of main transformer buses,which maximize the running reliability during 35 kV buses reinstallation and minimize the loss of energy. By doing so the running safety of the power grid is ensured during the equipment reinstallation.

关 键 词:变电站 母线 主变过引线 改造 

分 类 号:TM645.11[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象