检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯国庆[1] 王宇[1] 刘竟成[2] 宋社民[3] 王亚洲[3]
机构地区:[1]西南石油大学油气藏地质及开发工程国家重点实验室,成都610500 [2]重庆科技学院,重庆401331 [3]中石油华北油田分公司,任丘062552
出 处:《重庆科技学院学报(自然科学版)》2010年第2期32-34,共3页Journal of Chongqing University of Science and Technology:Natural Sciences Edition
摘 要:雾迷山组底水油藏已经进入特高含水、高采出程度开发阶段,绝大部分油井发生水淹,可采储量计算结果表明油藏还有相当大的増油潜力。根据油藏的特征建立底水油藏单井渗流模型,算出该油藏高含水阶段的合理井网密度。任9、任11山头的井网密度较低,在其腰部和脊部可以侧钻大斜度井或水平井;任6、任7山头的井网密度较高,重点应该放在合理调整注采井的关系上。Wumishan reservoir is a bottom-water-drive reservoir, and it is in high water cut stage and of high degree of reserve recovery. At present, most producers have been submerged by water.So it is difficult to recover the remaining oil. The calculation results demonstrate that the reservoir has remaining oil in ground. Based on the characteristics of the reservoir, a single well flow model of partly opened bottom-water-drive reservoir is applied to obtain the reasonable well spacing density. The well spacing on the top of buried hill Ren 9 and Pen 11 is low. High angle deviated wells and horizontal wells are recommended to be set on the buried hill slope and buried hill ridge. The well spacing on the top of buried hill Pen 6 and Ren 7 is high. It is necessary to adjust the relationship of injectors and producers.
分 类 号:TE357[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.68