作 者:王勇[1] 陈仁全[1] 杨廷志[2] 彭英[2] 池安祥
机构地区:[1]重庆电力高等专科学校,重庆400053 [2]重庆市电力公司綦南供电局,重庆401420
出 处:《重庆科技学院学报(自然科学版)》2010年第2期140-143,共4页Journal of Chongqing University of Science and Technology:Natural Sciences Edition
基 金:重庆市电力公司自控科技项目
摘 要:针对模拟电荷法和边界元法的缺点,提出将两种方法结合起来计算高压变电站内工频电场分布。采用BEM计算变电站内开关设备表面电荷产生的电场,针对变电站内设备各部件的不同性质,分别推导接地金属支柱、介质分界面与悬浮导体的间接边界积分方程。采用CSM计算母线自由电荷产生的电场,完成工频电场分布。In this paper,the charge simulation method (CSM) and the boundary element method (BEM) that are two ways to calculate the high-voltage substation' s industrial-frequency electric field are introduced.For these two methods have their own shortcomings, a new method is put forward which combines the CSM with the BEM. BEM is used to solve the electric field generated by the surface charge of the switchgear.As the various components have different nature, indirect boundary integral equation of the grounded metal pillar, the interface between media and suspended conductor are derived.Then CSM is used to solve the electric field generated by the bus.As a result the power frequency electric field distribution is completed which takes the influences of the critical equipment within the substation into consider.
分 类 号:TM835[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28