检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北省武汉市430072 [2]武汉大学水利水电学院,湖北省武汉市430072 [3]华电福建发电有限公司古田溪水力发电厂,福建省古田市352258
出 处:《水电自动化与大坝监测》2010年第2期45-48,共4页HYDROPOWER AUTOMATION AND DAM MONITORING
摘 要:古田溪四级大坝坝基渗1号测压孔扬压水位存在着变化过程骤升和骤降、部分时期扬压水位明显偏高等异常现象,通过建立渗1号测压孔扬压水位统计模型,分析了扬压水位与上游水位之间的相关关系以及6号坝段坝基扬压力横向分布状态,研究了渗1号测压孔扬压水位异常的可能成因,评价了6号坝段坝基防渗帷幕的工作状态。There exist some abnormal phenomena at 1 # pressure tap of the dam base of Gutianxi Dam IV, because the changing process of the uplift water level jumps suddenly and falls sharply and sometimes the uplift water level is obviously on the high side. By establishing the statistical model of the uplift water level at 1 # pressure tap, this paper analyzes the correlation between the uplift water level and the upstream water level, as well as the horizontal distribution status of the uplift pressure in the foundation of 6# dam block. The possible causes of the abnormal uplift water level at 1 # pressure tap are also studied, and the working condition of the anti-seepage curtain in the foundation of 6 # dam block is evaluated.
分 类 号:TV223.4[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117