动素分析法在装配线平衡中的应用  被引量:3

Application of therbligs analysis in assembly line balancing

在线阅读下载全文

作  者:张玲[1] 曹敏[2] 彭鸿广[1] 周碎兰[1] 

机构地区:[1]浙江科技学院经济与管理学院,杭州310023 [2]浙江科技学院中德学院,杭州310023

出  处:《浙江科技学院学报》2010年第2期89-93,106,共6页Journal of Zhejiang University of Science and Technology

基  金:浙江省科技计划重点项目(2006C24007)

摘  要:为使装配线发挥最大的效能,需要将工作合理地分配到装配线的各个工位上,以达到装配线平衡。为此,以某公司扎把机装配线为研究对象,针对装配线的具体流程,结合装配线平衡理论,找到装配线中的"瓶颈"工序;采用动素分析法进行详细的工序分析,并运用ECRS原则进行改善。结果表明,新方案的实施可使装配线平衡率明显提高。Assembly line balancing (ALB) is an attempt to distribute the work required to assemble a product in mass or series production among a set of work stations on an assembly line so that certain measures of performance are optimized. We study the process flow of an illustrative assembly line and find out the bottleneck working procedures according to the theory of assembly line balancing by examples of a certain company. The bottleneck working procedures are analyzed by therbligs analysis and improved by ECRS. Implementation of this new scheme makes the rate of production line balance increase in evidence.

关 键 词:动素分析 装配线平衡 ECRS 

分 类 号:TH693.5[机械工程—机械制造及自动化] F406.2[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象