土工格栅在老蟒河倒虹吸工程中的运用  

Application of Geotechnical Grille to Inverted Siphon Project on the Laomang River

在线阅读下载全文

作  者:罗涛[1] 罗毅[1] 王新奇[1] 

机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003

出  处:《红水河》2010年第2期75-77,共3页Hongshui River

摘  要:南水北调中线一期穿黄工程北岸渠道经过老蟒河,采用河道倒虹吸的方式进行交叉。由于倒虹吸进出口渐变段扶壁式挡土墙较高,高度13.1 m,挡土墙稳定是工程设计的一个难题。采用土工格栅加筋的形式,突破传统设计思路,使常规扶壁式挡土墙结构与加筋挡土墙新型结构有效结合,对今后的高挡土墙设计有一定借鉴作用。The channel on the northern bank of the first phase Yellow River-crossing project at middle route of the South-to-North Water Transfer Project passes through the Laomang River via inverted siphon. As the buttressed retaining wall at transition section of the inverted siphon's inlet and outlet is 13. lm high, to keep the wall stable is difficult in design. The use of reinforced geotechnical grille is a breakthrough to conventional design for the grille can effectively band conventional buttressed retaining wall and reinforced retaining wall together, which is referential for design of high retaining wall in the future.

关 键 词:高挡土墙 土工格栅 土压力 承载力 老蟒河倒虹吸工程 

分 类 号:TU318[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象