检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大连理工大学水利工程学院,辽宁大连116024 [2]河南省白龟山水库管理局,河南平顶山467031
出 处:《水力发电学报》2010年第2期132-138,共7页Journal of Hydroelectric Engineering
基 金:国家自然科学基金资助项目(50479056);国家科技支撑计划课题(2006BAB14B05);水利部重大科技项目资助(水规划[2002]341号)
摘 要:摘要:本文针对白龟山水库设计与运用汛限水位"静态控制法"所造成洪水资源浪费和上游昭平台水库控泄能力较弱的事实,设计了基于白龟山以上全区累积净雨作为水库泄洪的主要判断指标的防洪预报调度方式,同时对防洪风险和兴利效益进行了定量分析和表述。实例研究表明,运用防洪预报调度方式是可行和必要的,既有理论意义,又有经济价值。The traditional operation of Zhaopingtai reservoir is based on a static control method and the storage level limit of design flood,but it often causes water resources waste due to the weak discharge control capacity of Baiguishan reservoir at the upstream of Zhaopingtai. In this study the total precipitation of Baiguishang reservoir basin is used as a main index for the flood release decision of this reservoir,and through an analysis the flood control risk and benefits are expressed in a quantitative way. The results show that this new method is feasible and necessary,and it is theoretically valuable and economically beneficial.
关 键 词:水电工程 防洪预报调度方式 风险分析 洪水资源化 白龟山水库
分 类 号:TV697.11[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222