检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《地震地质》2010年第1期115-126,共12页Seismology and Geology
摘 要:大地震的成因与预测是很复杂的,很难用一个模式把它们全面概括起来,所以文中用4个模式来描述。这4个模式分别是叠加模式、组合模式、立交模式和调制模式。它们在震源孕育和发震过程中各有各的功能。叠加模式是讨论孕震力源问题的,组合模式是讨论震源结构问题的,立交模式是讨论孕震断层面上的凹凸齿合是如何形成的问题的,调制模式是讨论临发震前震源处的不稳定与外因的关系问题的。文中用以上4个模式讨论2008年汶川8级地震的回顾性预测。The cause and prediction of great earthquake are very complicated. It is difficult to totally summarize them using one model. In the paper,we use four models to describe them,namely,the superposition model,the combination model,the stereographic cross model and the modulation model. Each of the four models plays a different role in describing the preparation and occurrence of an earthquake. The superposition model deals with the problem about the driving force of earthquake preparation. The combination model discusses the problem about the structure of earthquake source. The stereographic cross model discusses the problem of how the asperity on the fault plane in the seismic source forms. And the modulation model focuses on the problem about that external factors triggering instability in the source region and its vicinity during short and imminent term before an earthquake. The paper tries to make a retrospective prediction of the Ms 8.0 Wenchuan earthquake in 2008 using the above- mentioned models.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

