半水煤气直冷塔的计算与设计  被引量:2

Calculation and Design of Semi-Water Coal Gas Direct-Cooling Tower

在线阅读下载全文

作  者:白二川 

机构地区:[1]原平昊华化工有限公司,山西原平034100

出  处:《化肥设计》2010年第2期11-15,共5页Chemical Fertilizer Design

摘  要:为降低合成氨装置压缩机一段入口的半水煤气温度,设计了填料式直接冷却塔,用水作为冷却剂。介绍了直冷塔的设计计算过程,包括塔的选型,气液比的确定,空速、塔径、填料高度的计算,填料层压降、喷淋密度的核算,以及塔附件的设计等。生产运行结果表明,出塔半水煤气温度由原来的42℃下降到30℃以下。In order to reduce the inlet temperature of semi-water coal gas at the first stage of compressor in the synthetic ammonia plant,author has designed the direct cooling tower of packing type,using the water as the cooling agent,has introduced the design calculation process of the direct cooling tower,including the calculations of tower selection,determination of gas/liquid ratio,empty tower speed,diameter of tower and packing height etc.,also the checking of pressure drop of packing layer and spraying density,as well as design etc.of tower attachments.Production running result indicates that the temperature of semi-water coal gas out of the tower is reduced from the former 42 ℃ to 30 ℃ below.

关 键 词:填料塔 热负荷 泛点气速 塔径 填料层压降 煤气温度 

分 类 号:TQ113.264[化学工程—无机化工]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象