TBM Construction Process Simulation and Performance Optimization  

TBM Construction Process Simulation and Performance Optimization

在线阅读下载全文

作  者:刘东海 周云晴 焦凯 

机构地区:[1]School of Civil Engineering, Tianjin University

出  处:《Transactions of Tianjin University》2010年第3期194-202,共9页天津大学学报(英文版)

基  金:Supported by National Natural Science Foundation of China (No.50709024);Program for New Century Excellent Talents in University (No. NCET-08-0391)

摘  要:Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different tunnel sections, which makes the construction scheduling and management difficult. Based on the rock mass classification, this paper estimates the penetration rate. Using the rate, a cyclic network simulation (CYCLONE) model of TBM boring system is established, and the advance rates under different geological conditions are determined. Then, the impact of different cutter head thrust, which is chosen in reasonable range according to previous experiences, on pro- ject schedule is analyzed. Moreover, the simulation model of mucking system is built to determine the number of muck trains and rail intersections reasonably, regarding the efficiency of muck loading and material transporting. Based on the interaction and interrelation between TBM boring system and mucking system, the combined CY- CLONE model for the entire tunneling process is established. Then reasonable construction schedule, the utilization rate of working resources, and the probability of project completion are obtained through the model programming. At last, a project application shows the feasibility of the presented method.Long tunnel excavation with tunnel boring machine (TBM) is a complex and stochastic process. It is easily affected by uncertainties and needs to be adjusted according to specific geological conditions in different tunnel sections, which makes the construction scheduling and management difficult. Based on the rock mass classification, this paper estimates the penetration rate. Using the rate, a cyclic network simulation (CYCLONE) model of TBM boring system is established, and the advance rates under different geological conditions are determined. Then, the impact of different cutter head thrust, which is chosen in reasonable range according to previous experiences, on project schedule is analyzed. Moreover, the simulation model of mucking system is built to determine the number of muck trains and rail intersections reasonably, regarding the efficiency of muck loading and material transporting. Based on the interaction and interrelation between TBM boring system and mucking system, the combined CYCLONE model for the entire tunneling process is established. Then reasonable construction schedule, the utilization rate of working resources, and the probability of project completion are obtained through the model programming. At last, a project application shows the feasibility of the presented method.

关 键 词:tunnel boring machine (TBM) construction simulation SCHEDULE efficiency analysis OPTIMIZATION 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 