CDEGS在复杂大型接地网优化设计中的应用研究  被引量:7

Application of CDEGS on complicated large grounding grid design

在线阅读下载全文

作  者:郭振威[1] 罗庆跃[1] 袁旭龙[1] 蔡维[2] 肖相纯 

机构地区:[1]邵阳学院电气工程系,湖南邵阳422000 [2]广西电力工业勘察设计研究院,广西南宁53000 [3]怀化水利电力勘察设计研究院,湖南怀化418000

出  处:《湖南电力》2010年第2期4-8,27,共6页Hunan Electric Power

摘  要:如何有效地降低接地电阻、最大接触电压和最大跨步电压是复杂大型接地网设计经常碰到的一个难题。应用CDEGS仿真分析传统经验法设计的一个500 kV变电站接地网存在危险过电压、资源浪费等现象,通过大量仿真研究,找到该地网设计的最佳方案。CDEGS在土壤、地网建模等方面有着精确、灵活的优势,应用它进行复杂大型接地网设计能够取得良好技术经济效益,保证地网运行安全可靠。How to effectively reduce grounding resistance, the maximum contact potential difference, and maximum step voltage of grounding grids are often encountered problems in complicated large grounding grid design. CDEGS simulation was used to analyze the danger overvoltage and resource waste existing in 500 kV substation grounding grid design using traditional expe- rience methods. The optimization design scheme was obtained by a large amount of simulation researeh and CDEGS was proved to have remarkable advantages on soil and grounding grid modeling. Application of CDEGS on complicated grounding grid design is economic and reliable for safety operation of grounding grid.

关 键 词:接地电阻 最大接触电压 最大跨步电压 CDEGS 

分 类 号:TM761[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象