长江石首段航道整治工程行洪影响研究  被引量:8

Study on influence of channel regulation project on flood discharge in Shishou Reach of Yangtze River

在线阅读下载全文

作  者:谷利华[1] 岳红艳[1] 张杰[1] 

机构地区:[1]长江科学院河流所,湖北武汉430010

出  处:《人民长江》2010年第8期5-8,共4页Yangtze River

基  金:长江科学院基本科研业务费项目(YWF0712/HL05;CKSF2010002)

摘  要:分析了长江石首河段航道整治一期工程河段近期河床演变特点及演变趋势,采用平面二维水流数学模型计算分析了工程对河道水位及流场等的影响,并综合分析了工程对河势和行洪的影响。研究结果表明:拟建工程实施后不会对该河段行洪及河势产生明显的不利影响,但局部河势仍会有一定的调整。该研究成果可为航道整治工程设计提供科学依据。We studied the recent feature and tendency of the fluvial process after implementation of the proposed phase-I works of channel regulation project in Shishou Reach of Yangtze River.Integrating 2D mathematical model,the influence of the project on water level,flow field,river regime and flood discharging is analyzed comprehensively.The results show that the implemented works will not cause adverse effect on flood discharging and river regime,but local river regime will be adjusted,which can provide a scientific basis for design of the channel regulation project.

关 键 词:河床演变 数学模型 航道整治 长江石首段 

分 类 号:TV85[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象