检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:凌骐[1] 黄淑萍[1] 张志超[1] 曾为成[1]
出 处:《人民长江》2010年第8期67-70,共4页Yangtze River
摘 要:依据某常态混凝土拱坝的详细施工进度和实际监测资料,采用三维有限单元法对拱坝横缝灌浆前进行了施工期仿真计算。重点讨论了该拱坝分别采用两种不同温控措施后,坝体内温度场和温度徐变应力场的分布情况。通过敏感性分析,比较了两种温控措施的效果及实际作用,所获得的结论对于同类工程的设计和施工有一定的参考价值。By means of three-dimension finite elements method and according to the detailed construction progress and the monitored data of a normal concrete arch dam,simulation analysis for the typical dam monoliths during the construction period is performed.The distribution of internal temperature field and thermal creep stress field of the dam under 2 different temperature control measures are mainly discussed.The actual temperature control effects of two measures are compared based on sensitivity analysis.The conclusions can provide reference for design and construction of similar projects.
关 键 词:敏感性分析 有限元仿真 温控防裂 混凝土温控 拱坝
分 类 号:TV642.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222