检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡大学水利与环境学院,湖北宜昌443002
出 处:《人民长江》2010年第8期92-95,共4页Yangtze River
摘 要:针对威远江水电站岸边式溢洪道挑流消能存在的问题,采用RNGk-ε双方程模型、非结构网格与自适应局部网格加密的方法,模拟湍流,利用流体体积分数法(VOF)确定自由水面线,成功地对溢洪道挑流鼻坎挑流进行了三维紊流数值模拟。对挑流鼻坎的修改方案进行了研究,经过计算提出了较优方案,所提方案得到了物理模拟的验证,为威远江水电站设计与优化提供了可靠的设计依据。In light of the problems of bucket type energy dissipation in bank-run spillway at Weiyuanjiang Hydropower Station on the Weiyuan River,the three-dimensional numerical simulation of spillway flip bucket turbulent flow is successfully conducted by the use of RNG k-ε double-equation model,unstructured mesh and self-adaptive local mesh refinement method.We use VOF method to determine water profile of free surface.The modified schemes of flip bucket are researched and the optimized one,which has been verified by physical model,is proposed.It provides a reliable basis for the design and optimization of Weiyuanjiang Hydropower Station.
分 类 号:TV651.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3