ZL型悬移顶梁液压支架在薄煤层超前支护中的推广与应用  

ZL-form are unsettled in extension and application in thin seam advance shoring moving back timber hydraulic support

在线阅读下载全文

作  者:吴守峰[1] 赵志杰[1] 李伟[1] 

机构地区:[1]山东新汶矿业集团山东新汶矿业集团翟镇煤矿,山东新泰271204

出  处:《山东煤炭科技》2010年第2期22-22,24,共2页Shandong Coal Science and Technology

摘  要:翟镇煤矿为解决超前支护难题,不断探索新型支护形式。ZL型悬移顶梁液压超前支架应用为顺槽超前支护提供了一种全新的、机械化程度较高的支护方式。该型超前支护支架的应用切实解决了现场存在的高度、支护强度问题,取得了较好的效果,具有较高的推广价值。The Zhai town coal mine is the difficult problem resolving the advance shoring , probes the new model shoring form unceasingly. Z L - form are unsettled moving back timber hydraulic pressure advance holder application for the shoring has provided higher shoring of one kind of the degree brand - new , mechanizing way along slot advance. Have owed type advance shoring holder application the intensity problem having resolved the altitude , shoring there existing in scene conscientiously , have got fairly good effect , have had higher extension value.

关 键 词:综采工作面 悬移顶梁液压支架 超前支护 研究与应用 

分 类 号:TD325.2[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象