检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第一航务工程勘察设计院有限公司,天津300222
出 处:《中国港湾建设》2010年第2期18-20,共3页China Harbour Engineering
摘 要:随着设计船型突破20万吨级,天津港码头位置向东部较开敞区域发展,码头前沿波高增大。在专业化散货码头建设过程中,天津港地区传统的高桩梁板结构逐步体现出变形大、整体造价趋高的特点。结合具体工程项目,提出了一种穿插布置墩台结构和梁板结构的新方案。优化后的方案,结构合理,工程造价低、施工方便。With the design of over 200 000 huge tonners, the wharf position of Tianjin Harbor will definitely be developed to eastern open areas, and therefore, the wave height of wharf apron has to be increased. During the construction of professional hulk cargo wharf, traditional high piled beam-slab structure progressively reflects the characters of great deformation and high cost. Based on the specific engineering projects, this paper puts forward a new program for decorating abutment structure and girder pier structure by alternate. The optimized program has characters of reasonable structure, low cost, convenient construction
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28