摘 要:以梁—万高速公路金竹林连拱隧道为研究对象,通过现场试验和数值模拟计算,提出了连拱隧道地下水渗流场的变化主要影响因素是隧道埋深、裂隙发育情况、围岩松动圈大小以及施工工序等。研究结果表明,地下水渗流场的改变对连拱隧道结构防排水的影响显著。为了从根本上解决连拱隧道结构渗漏水技术难题,通过数值模拟计算提出了注浆固结V形区地层,能有效的改善地下水渗流场的主要参数。Taking the Jinzhulin tunnel on Liangping-Wanzhou highway as the background,through in-situ tests and numerical simulations,it is concluded that the major factors that influence the ground water seepage fields around the double-arch tunnel include the overburden depth,fracture development,magnitude of loosened rock mass rings and construction sequences and that the variations of the ground water seepage fields significantly influence on the water-proofing and drainage of the double-arch tunnel.The major parameters of the ground water seepage fields can be effectively improved by grouting the V-shaped zones of the tunnel.
分 类 号:TD853.34[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.71