检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郦亮[1]
机构地区:[1]北京科技大学土木与环境工程学院,北京100083
出 处:《施工技术》2010年第5期12-14,共3页Construction Technology
摘 要:以北京地铁10号线国贸站~双井站区间隧道施工为背景,采用有限元差分程序FLAC3D建立了有限元模型,对盾构推进过程中隧道应力、变形及地表沉降规律进行研究。通过隧道上方地表横向监测点沉降、隧道中心地表沉降和地表建筑物基础沉降实测值与计算值比较,得出模拟计算结果与实际检测结果比较符合,但实际施工过程中存在复杂性和不确定因素。Based on construction of Guomao station-Shuangjing station of Beijing Metro Line 10,tunnel stress,deformation and ground surface settlement are researched through calculation by FLAC3D software. Furthermore,some calculating results are compared with monitoring results such as transverse settlement of ground surface,ground surface settlement over vault and building foundation settlement. The comparison shows that calculating results accord with monitoring results,however,there are complex uncertain factors in practical construction.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222