司家营铁矿阶段充填法开采流固耦合数值模拟  被引量:7

Numerical Simulation of Fluid-Solid Coupling for Level Longhole Stoping with Subsequent Filling in Sijiaying Iron Mine

在线阅读下载全文

作  者:周冬冬[1] 高谦[1] 余伟健[2] 翟淑花[1] 

机构地区:[1]北京科技大学金属矿山高效开采与安全教育部重点实验室,北京100083 [2]湖南科技大学能源与安全工程学院,湖南湘潭市411201

出  处:《矿业研究与开发》2010年第2期19-22,共4页Mining Research and Development

摘  要:为了开展司家营铁矿南区充填法采矿的可行性论证以及开采设计参数优化,通过渗流-应力耦合数值正交试验,建立了南区开采的优化模型,揭示地下开采对地表岩移和渗流场的影响。计算结果表明:采用充填法采矿,不会产生地面塌陷;开采过程中围岩中的水会向采空区涌出,主要集中在第一阶段和第二阶段的采场当中,可能产生危险,应提早防范。In order to study the the feasibility of stoping-and-filling method and the optimal parameters of mining design in the southern district of Sijiaying iron mine,a model for the mining optimization of the southern district was established by seepage-stress coupling numerical orthogonal test.The effect of underground mining on ground rock movement and seepage field was revealed.The results showed that stoping-and-filling will not cause surface collapse,groundwater will gush into Goaf from surrounding rock in the course of mining,especially in stopes of the first and second level gushing water could introduce dangerous which should be preventing in advance.

关 键 词:充填法 正交试验 优化模型 渗流-应力耦合 数值模拟 

分 类 号:TD853[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象