1000MW超超临界燃煤机组中速磨煤机制粉系统给煤层标高优化  被引量:2

Coal Feeder Layer Elevation Optimization of Medium-speed Mill Pulverizing System of 1000MW Ultra Supercritical Coal-fired Unit

在线阅读下载全文

作  者:潘灏[1] 霍沛强[1] 李伟科[1] 尹进[1] 

机构地区:[1]广东省电力设计研究院,广东广州510663

出  处:《广东电力》2010年第4期79-80,共2页Guangdong Electric Power

摘  要:研究1000MW超超临界燃煤机组中速磨煤机制粉系统给煤层标高的优化问题,指出通过优化煤仓间设计、降低其高度,同时在满足运行和检修的前提下,减小其总体积,可以减少机组的总造价;针对不同磨煤机的检修方式、送粉管道的不同布置情况提出了优化煤仓间标高的方案,运行实践证明,该设计方案是可行的。The coal feeder layer elevation optimization of medium-speed mill pulverizing system of 1000MW ultra supercritical coal-fired unit is dealt with.It is indicated that the total costs of unit could be reduced by lowering the coal bunker via its design optimization,and decreasing its total volume while meeting the needs of operation and maintenance.The scheme for optimizing coal bunker elevation is proposed in light of maintenance patterns of different mills and varied arrangements of coal feeding pipelines.The feasibility of the proposed scheme is verified in operation.

关 键 词:1000MW超超临界燃煤机组 布置优化 给煤层标高优化 

分 类 号:TK223.24[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象