检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《广东电力》2010年第4期79-80,共2页Guangdong Electric Power
摘 要:研究1000MW超超临界燃煤机组中速磨煤机制粉系统给煤层标高的优化问题,指出通过优化煤仓间设计、降低其高度,同时在满足运行和检修的前提下,减小其总体积,可以减少机组的总造价;针对不同磨煤机的检修方式、送粉管道的不同布置情况提出了优化煤仓间标高的方案,运行实践证明,该设计方案是可行的。The coal feeder layer elevation optimization of medium-speed mill pulverizing system of 1000MW ultra supercritical coal-fired unit is dealt with.It is indicated that the total costs of unit could be reduced by lowering the coal bunker via its design optimization,and decreasing its total volume while meeting the needs of operation and maintenance.The scheme for optimizing coal bunker elevation is proposed in light of maintenance patterns of different mills and varied arrangements of coal feeding pipelines.The feasibility of the proposed scheme is verified in operation.
关 键 词:1000MW超超临界燃煤机组 布置优化 给煤层标高优化
分 类 号:TK223.24[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28